Physical water treatment

More chemicals aren't the answer. Physics is.

Cut OPEX with MERUS: physical protection for your water system. Less maintenance, fewer shutdowns, fewer hidden costs.

Merus Ring
30+ years of Merus GmbH
45+ Countries represented
15K+ Installations
3-6 months to visible results

Problems we solve

Three enemies of your water system

Minerals, rust and biology reinforce each other. MERUS weakens the bonds that lock them onto surfaces.

01

Scale

Dissolved minerals such as calcium carbonate crystallise over time, forming hard deposits that reduce flow and heat transfer.

See cases →
02

Corrosion

Metal breakdown caused by oxygen and moisture. It shows up as rust or pitting that shortens equipment life.

See cases →
03

Biofilm

Organic build-up of bacteria and algae that clogs water systems, especially in cooling towers and damp environments.

See cases →

How Merus works

Physical oscillation No chemicals No energy No pipe cutting
01

Installation

  • External clamp-on ring on the existing pipe, with no cutting, no welding and no shutdown.
  • Installed in minutes. Any pipe material or diameter.
  • 100% passive from day one: no electricity, no additives, no maintenance.
02

Effect

  • The oscillations pass through the pipe wall and travel with the flow.
  • The oscillations increase the solubility of minerals such as calcium and magnesium dissolved in the water.
  • No chemical reaction: physical interference.
03

Response

  • These new oscillations interfere with the natural oscillations of the minerals dissolved in the water.
  • Existing scale softens and breaks away. New deposits stop forming.
  • Biofilm loses its grip: with no mineral surfaces, it cannot colonise.

Mechanism: physical oscillation with results across multiple sectors. Empirical, not theoretical

Proven results

Real installations. Measurable improvements.

Documented cases in offshore, marine, refining and HVAC.

Merus Chain

Marine biofouling: Seawater riser, Qatar

Northern offshore drilling, Qatar · Merus Chain on the riser pipe

Parameter Before After: 6 months
Pipe Progressive blockage Clear section for longer
Maintenance interval 6 months 12 months extended 2×
Treatment Chemical Physical
Merus Chain installed
Installation

Merus Chain: external clamp-on on the riser.

Riser interior before
Before

Sea growth in a sea water deep well riser that reduces flow and consequently disables heat transfer in the heat exchangers.

Riser interior after
After

Marine growth broke away and was carried off by the flow. Pressure and flow stabilised; cooling recovered.

Merus Ring

Internal corrosion: Seawater pipe

Severe corrosion and progressive build-up that reduced flow.

Parameter Before After: 9 months
Pipe Severe internal corrosion Corrosion stabilized
Maintenance interval 9 months 21 months extended 2.5×
Treatment Chemical Physical
Installation: seawater pipe
Installation

Merus Ring clamp-on on the seawater pipe

Severe corrosion: before
Before

Severe internal corrosion accelerating wall degradation. Progressive build-up and risk of unplanned downtime.

Clean pipe: after
After

Progressive removal of corrosion. The ring stopped new deposits and cleaned the walls.

Merus Ring · Netherlands

Biofouling: Seawater intake line

Patrol vessel, Netherlands · Merus Ring on the seawater intake line

Parameter Before After: 12 months
Pipe Severe biofouling blockage Section practically clear
Maintenance interval 12 months 36 months extended 3×
Treatment Chemical Physical
Merus Ring installed on the intake line
Installation

Merus Ring mounted on the intake line, external clamp-on in the engine room.

Intake line without Merus, biofouling
Before

Without Merus, marine biofouling typically blocks the seawater intake line within about 12 months.

Intake line with Merus, clear
After

With Merus Ring installed, the line stayed largely clear. Marine growth was inhibited and carried off by the flow.

Marine and maritime · Merus Ring

Scale in boiler and heat exchanger tubes

Steam boiler cooling system, marine / maritime sector.

Parameter Before After: 4 months
Pipe Scale reducing flow and heat transfer Flow and heat transfer restored
Maintenance interval 4 months 12 months extended 3×
Treatment Chemical Physical
Merus Ring installation, marine heat exchanger
Installation

Merus Ring on the steam boiler cooling system, external clamp-on.

Heat exchanger tubes before
Before

Severe scale and corrosion inside the exchanger tubes. Continuous treatment was in place, yet deposits kept reducing heat transfer and flow.

Heat exchanger tubes after 4 months
After

Deposits dissolved and surfaces came out clean, with no mechanical work. The ring mitigated corrosion and prevented rust build-up in the tubes.

Refining and petrochemicals

Cooling system

Biological fouling and corrosion in dead zones of the circuit.

Parameter Before After: 10 months
Pipe Biofilm and corrosion in dead zones Clear flow, corrosion stabilized
Maintenance interval 10 months 25 months extended 2.5×
Treatment Chemical Physical
Installation: cooling circuit
Installation

Merus Ring in the cooling circuit.

Cooling before
Before

Biofouling and corrosion in dead zones that obstructed flow.

Cooling after
After

Biofilm disappeared with no extra mechanical cleaning. Corrosion stabilised: from >10 mpy to <1.5 mpy.

Cruise and marine · Merus Ring

Scale in the fresh water generator

Holland America Line, MS Rotterdam

Parameter Before After: 9 months
Pipe Persistent scaling despite chemical treatment Scale softens, easy removal
Maintenance interval 4 months 16 months extended 4×
Treatment Chemical Physical
Merus Ring installation, fresh water generator
Installation

Merus Ring clamp-on on the fresh water generator's heat exchanger.

Exchanger plates before, with scale
Before

Scale on the exchanger plates persisted despite continuous chemical treatment. Manual cleaning every 3 months.

Exchanger plates after 9 months, clean
After

Scale on the evaporator plates softened enough to be removed by hand.

It doesn't replace your current treatment. It reduces it.

Cleaner operation. Lower costs.

No chemicals

Eliminate or reduce treatment additives. Less waste, less risk and lower consumable costs.

No maintenance

No filters to change, no dosing pumps. The ring works continuously once installed.

No electricity

Zero energy consumption. Ideal for plants, hotels, marine and remote sites.

Comparison

Same results.
Without the chemical cost.

Five fronts where conventional treatment holds your plant back, and where Merus wins.

Criterion
Conventional methods Ongoing cost
MERUS Ring / Chain One-time cost
Chemicals
ConventionalContinuous dosing of antiscalant and biocide
MERUSOscillation treatment, nothing is added to the water
Coverage
ConventionalChlorination only reaches the dosing point
MERUSThe effect travels with the flow, including dead legs
Shutdowns
ConventionalScheduled CIP and pigging, production stopped
MERUSContinuous passive protection, far fewer cleaning shutdowns
Environment
ConventionalComplicated and costly water disposal. Environmental risk
MERUSNothing is added, nothing is disturbed
OPEX
ConventionalOngoing purchase and logistics of consumables
MERUSNo consumables: once installed, the ring works quietly for years

Try it for 90 days. No chemicals. No initial purchase commitment.

Request a quote

Five reasons to use Merus

Decision criteria that matter on site: downtime, OPEX and evidence.

01
Installed in minutes

Without cutting pipes or stopping processes

02
Zero inputs

No chemicals, no electricity, no maintenance

03
Passive operation

Once installed, the ring works quietly for years

04
Visible results

Visual inspection and water parameters within weeks

05
Local support

Technical team in Spain and Portugal

MERUS solutions

Ring and Chain: the same physical oscillation principle, two formats by diameter and environment.

Merus Ring

Merus RingClamp-on, ½" to 24"

Technical specifications

  • Installation: External clamp-on ring. No pipe cutting and no stopping the system.
  • Maintenance: 100% passive. No electricity and no moving parts.
  • Operational result: Stabilises differential pressure and cuts energy consumption (kWh). Significantly reduces the frequency of chemical CIP cycles.
  • System integration: Optimised for RO feed lines, high-pressure pumps and heat exchangers.
  • Dimensions: ½" to 24"
Merus Chain Subsea

Merus ChainSubsea · modular diameter

Technical specifications

  • Installation: External subsea chain, unlimited scalability. No pipe cutting and no operational shutdown.
  • Maintenance: 100% passive. No electricity and no moving parts.
  • Operational result: Stops marine growth at the source while inhibiting scale and corrosion at the same time.
  • System integration: Main application: seawater intakes and RO feed systems.
  • Modular scalability: The link design allows unlimited scalability. Adapt the diameter by adding blocks to the chain.

A 90-day pilot at your plant

Tell us about your water system. We'll propose Ring or Chain and a measurable follow-up plan.

Country
Water circuit
What water problem are you facing?

Request a quote